In 2014, a connection at the Audrain project landed some work with a steel fabricator. Part of 4DRDS' job for Parker Construction was laying out all the steel in the building. Andy (the owner of the steel fabricating company) required near exact field measurements for his work - keep in mind the building shape is a parallelogram without consistent wall surfaces to measure from. Rob gained his trust as Rob and those at Parker worked diligently and accurately to make his fabrications fit the first time, as there was often no other way to have it.
As a result, 4DRDS was contracted to provide shop drawings on a number of projects. Some of those projects included coordinating CAD files with specific companies that cut steel with computerized water jetting.
Audrain Project Metalwork Drawings